ORYX SO. DELAWARE OGT LLC

hazardous_liquid Incident — — May 3, 2018

Incident Information

Incident DateMay 3, 2018
OperatorORYX SO. DELAWARE OGT LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates32.01913, -102.01311

Cause

CauseINCORRECT OPERATION
SubcauseEQUIPMENT NOT INSTALLED PROPERLY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$325
Other Costs$0

Location Map

Incident Narrative

"ON MAY 3RD, 2018 AT APPROXIMATELY 16:15 CENTRAL TIME, ORYX WAS NOTIFIED BY 3RD PARTY PIPELINE OPERATOR (ENTERPRISE PRODUCTS) THAT A SPILL HAD OCCURRED AT THE ORYX PIG RECEIVER UPSTREAM OF THE ENTERPRISE METER LOCATION. THE PIPELINE WAS SHUT DOWN REMOTELY BY THE ORYX CONTROL ROOM. THE LEAK WAS LOCALLY ISOLATED AT APPROXIMATELY 16:25 BY OPERATIONS PERSONNEL FROM ENTERPRISE PRODUCTS BY CLOSING THE 2"" ISOLATION VALVE UPSTREAM OF THE COUPON HOLDER ASSEMBLY. ORYX EMPLOYEES WERE THEN DISPATCHED TO THE LEAK SITE AND ARRIVED ON LOCATION AT 16:50 TO BEGIN SPILL RESPONSE ACTIVITIES. AIR PATROL WAS DISPATCHED TO FLY THE ENTIRE PIPELINE PRIOR TO RESTARTING PIPELINE. PIPELINE WAS RETURNED TO SERVICE AT 22:30. INVESTIGATION CONCLUDED THAT THE 2"" TREADED PLUG ON COUPON ASSEMBLY WAS NOT TIGHTENED CORRECTLY. CORRECTIVE ACTIONS: REQUIRED CONTRACTOR TO REVIEW THEIR PROCEDURE FOR MANUALLY INSPECTING CORROSION COUPONS WITH THEIR EMPLOYEES AND PROVIDE RETRAINING. REQUIRED CONTRACTOR TO REQUALIFY THEIR EMPLOYEE ON THE OQ COVERED TASK BEFORE RETURNING BACK TO WORK AT ORYX FACILITIES. ORYX EXPRESSED THE IMPORTANCE TO ENSURING THAT THE JOB IS 100% COMPLETE BEFORE LEAVING JOB SITE DURING PROCEDURE REVIEW WITH CONTRACT COMPANY. UPDATED BY PHMSA IT PER PHP-6 & OPERATOR CONCURRENCE TO INSERT

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.