BOARDWALK LOUISIANA MIDSTREAM, LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | BOARDWALK LOUISIANA MIDSTREAM, LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 30.16553, -93.35931 |
Cause
| Cause | EXCAVATION DAMAGE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
A CONTRACTOR WHO WAS LAYING A NEW PIPELINE FOR BOARDWALK LOUISIANA MIDSTREAM HIRED A BORING CONTRACTOR. WHILE BORING UNDER BLM-11, THE DRILL BIT RUPTURED THE PIPELINE. NO FIRE OR INJURIES RESULTED. 4-17-17 UPDATED TO SUBMIT FINAL REPORT. PART F UPDATED TO CORRECT REPORTING INACCURACY ON ORIGINAL REPORT. 5-19-17 UPDATED BASED ON ADDITIONAL DATA RECEIVED. 1-23-19 SUPPLEMENTAL CREATED AS REQUESTED BY PHMSA. UPDATE: BOARDWALK LOUISIANA MIDSTREAM'S (BLM) 8-INCH PROPANE PIPELINE, REFERRED TO AS BLM-11, WAS STRUCK BY AN HDD MACHINE BEING USED TO CONSTRUCT A NEW BLM PIPELINE. BLM'S ONE-CALL TECHNICIANS FAILED TO LOCATE ALL BLM PIPELINES IN THE WORK AREA, AND THE CONTRACTOR USED ""AS-BUILT"" DRAWINGS AS A REFERENCE, WHICH HAD ERRORS. BLM'S THIRD-PARTY CONSTRUCTION INSPECTOR WAS NOT IN THE IMMEDIATE VICINITY OF THE DRILLING LOCATION WHEN THE INCIDENT OCCURRED.