ENTERPRISE CRUDE PIPELINE LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | ENTERPRISE CRUDE PIPELINE LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 33.38123, -96.40640 |
Cause
| Cause | EXCAVATION DAMAGE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON JANUARY 30TH 2017, AT APPROXIMATELY 15:30 THE HOUSTON CONTROL ROOM RECEIVED A PHONE CALL FROM A THIRD PARTY EXCAVATOR STATING A LINE STRIKE HAD JUST OCCURRED. THE CONTROL ON DUTY IMMEDIATELY BEGAN ISOLATING THE EFFECTED SEGMENT BY SHUTTING DOWN THE MAINLINE PUMPS AND CLOSING THE REMOTELY OPERATED VALVES UPSTREAM AND DOWNSTREAM OF THE STRIKE. LOCAL OPERATIONS WERE DISPATCHED TO THE SCENE AND BEGIN CLOSING THE FIRST MANUAL VALVE UPSTREAM OF THE LINE STRIKE. THE PUNCTURED SEGMENT OF PIPE WAS CUT OUT AND REPLACED WITH APPROXIMATELY 30 FEET OF NEW PIPE ON 2-4-17. THE S1 PIPELINE WAS INVENTORIED AND RETURNED TO SERVICE ON 2-5-17 AT APPROXIMATELY 08:50. AFTER INVESTIGATION IT WAS DETERMINED THAT A THIRD PARTY WORKING ON WIDENING STATE HIGHWAY 121 STRUCK THE S1 PIPELINE WITH THE BLADE OF A DOZER. THE FINAL COST HAS BEEN UPDATED TO FINALIZE THE REPORT.