ENTERPRISE CRUDE PIPELINE LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENTERPRISE CRUDE PIPELINE LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates32.65220, -103.13740

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 4:30 PM ENTERPRISE PERSONNEL DISCOVERED PRODUCT ON THE GROUND INSIDE HOBBS STATION. AT 5:00 PM THE 12"" STATION PIPING WAS ISOLATED AND THIS CAUSED THE LEAK TO STOP AND REMEDIATION TO BEGIN. AT 6:00 PM IT WAS DETERMINED THAT THE PERMANENT REPAIR WOULD EXCEED $50,000 AND THE NRC WAS IMMEDIATELY NOTIFIED. A CLAMP WAS INSTALLED OVER THE 12"" PIPE AND IT WAS RETURNED TO SERVICE AT 11:00 AM ON MARCH 14, 2017. 9/27/2018: SECTION OF PIPELINE WAS REPLACED AS A PERMANENT REPAIR. REPAIR PROJECT BEGAN IN JANUARY/FEBRUARY OF 2018 AND HAS SINCE BEEN COMPLETED.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in