"ONEOK NGL PIPELINE, LLC"

hazardous_liquid Incident — — August 10, 2018

Incident Information

Incident DateAugust 10, 2018
Operator"ONEOK NGL PIPELINE, LLC"
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates35.54874, -99.29455

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$3,600
Emergency Response$70
Other Costs$0

Location Map

Incident Narrative

"AT APPROXIMATELY 11:17 ON 8/10/2018 THE ONEOK PANTHER CREEK PLANT OPERATOR NOTIFIED THE LOCAL PIPELINE OPERATOR OF A LEAK ON THE LIQUIDS PIPELINE METER SKID. THE SOURCE OF THE LEAK WAS IDENTIFIED TO BE THE YZ SAMPLE PUMP ON THE METER SKID. THE SAMPLE PUMP WAS REPLACED AND THE METER SKID WAS RETURNED TO SERVICE. UPON INVESTIGATION, IT WAS DETERMINED THAT A POSSIBLE CAUSE WAS VIBRATION FROM THE CUSTOMER'S PLANT PD PUMPS. THE CUSTOMER EVALUATED THE TWO PUMPS AND REPLACED THE DISCHARGE PULSATION STABILIZER BLADDERS ON BOTH OF THEM. IN ADDITION, THE CUSTOMER HAS SETUP A PREVENTATIVE MAINTENANCE PROGRAM TO EVALUATE THE PULSATION STABILIZERS QUARTERLY. A VIBRATION SWITCH HAS ALSO BEEN INSTALLED ON THE ONEOK NGL METER SKID AS AN ALARM TO NOTIFY THE ONEOK NGL PIPELINE CONTROL CENTER."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in