BUCKEYE PARTNERS, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBUCKEYE PARTNERS, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates40.69673, -84.12671

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON APRIL 20, 2017, AT 1400, BUCKEYE LEAD STATION OPERATOR DISCOVERED FREE PRODUCT AT THE WEST CONTAINMENT AREA AT LIMA STATION. THE TANKS IN THE AREA WERE IMMEDIATELY ISOLATED. ALL EXTERNAL AND INTERNAL NOTIFICATIONS WERE MADE. THE RELEASE VOLUME IS ESTIMATED TO BE APPROXIMATELY 160 GALLONS OF ULTRA LOW SULFUR DIESEL. THE SPILL WAS CONTAINED ON COMPANY PROPERTY IN THE CONTAINMENT DIKE. EXCAVATION OF THE AREA DISCOVERED WHAT APPEARED TO BE A CRACK AT A WELD ON UNDERGROUND PIPING. A PLIDCO CLAMP WAS INSTALLED OVER THE RELEASE POINT AS A TEMPORARY REPAIR. PERMANENT REPAIR HAS BEEN SCHEDULED. THE REMOVED PIPING WILL BE SENT TO THIRD PARTY FOR METALLURGICAL ANALYSIS. 8/17/2018 FIELD EXAMINATION OF THE LEAK POINT APPEARS TO HAVE BEEN EXTERNAL CORROSION ON A GIRTH WELD. FINAL DETERMINATION WILL BE CONFIRMED WITH METALLURGICAL ANALYSIS ONCE PIPE IS REMOVED, A SUPPLEMENTAL REPORT WILL BE FILED ONCE TEST RESULTS HAVE BEEN RECEIVED. 12/3/2018 PERMANENT REPAIRS ARE SCHEDULED TO BE COMPLETED IN THE SECOND QUARTER OF 2019. FINAL DETERMINATIONS WILL BE CONFIRMED WITH METALLURGICAL ANALYSIS FOLLOWING COMPLETION OF THE REPAIRS. WILL COMPLETE A SUPPLEMENTAL REPORT IF ACTUAL FINDINGS ARE NOT EXTERNAL CORROSION AT GIRTH WELD.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.