PHILLIPS 66 PIPELINE LLC

hazardous_liquid Incident — — September 23, 2018

Incident Information

Incident DateSeptember 23, 2018
OperatorPHILLIPS 66 PIPELINE LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates35.41748, -119.70235

Cause

CauseEQUIPMENT FAILURE
SubcauseOTHER EQUIPMENT FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$6,048
Emergency Response$55,305
Other Costs$0

Location Map

Incident Narrative

"DUE TO 3RD PARTY EQUIPMENT MALFUNCTION OF PRESSURE PULSATION DAMPENER, CAUSED EXCESSIVE VIBRATION TO A 1/2"" NIPPLE THAT FAILED. AS A RESULT 4.38 BBL OF CRUDE OIL WAS RELEASED FROM CONTAINMENT. P66 CREW WAS DISPATCHED TO THE LEASE (TWISSLEMAN-HOPKINS), THE PIPELINE WAS ISOLATED, AND OSRO WAS DISPATCHED TO AID IN CLEAN UP. THE NIPPLE WAS REPAIRED, AND INTEGRITY TESTED WITH DYE PENETRATE. THE INSTRUMENTATION THAT WAS CONNECTED TO THE 1/2"" NIPPLE WAS RELOCATED. ****UPDATE 1/22/2019*****AS PER THE REQUEST OF CSFM HOSSEIN MONFARED THE FOLLOWING UPDATES WERE MADE************** 1) (A5) GPS COORDINATES UPDATED TO: LATITUDE: 35.41748236, LONGITUDE: -119.70234520 2) (D8) UPDATED ASSOCIATED COST WITH FINAL NUMBERS 3) (D8E) THERE WERE NO ENVIRONMENTAL REMEDIATION COST ASSOCIATED WITH THIS LEASE. ALL CONTAMINATED ROCK AND SOIL WAS HAULED OFF AND REPLACED WITH NEW. 4) (H) RECEIVED INITIAL NOTIFICATION FROM THE LOCAL LEASE OPERATOR ******UPDATED 8/29/2019***** AS PER THE REQUEST OF US DOT/PHMSA ASHLEY HORTON THE FOLLOWING UPDATES WERE MADE******* 1) (B-3) CHANGED ZIP CODE FROM 93251 TO 93268 ******UPDATED 9/3/2019***** AS PER THE REQUEST OF US DOT/PHMSA ASHLEY HORTON THE FOLLOWING UPDATES WERE MADE******* 1) DID NOT SUBMIT LAST SUPPLEMENTAL REPORT AS A FINAL REPORT"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in