"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — February 7, 2019

Incident Information

Incident DateFebruary 7, 2019
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.00906, -89.17924

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseORIGINAL MANUFACTURING-RELATED (NOT GIRTH WELD OR OTHER WELDS FORMED IN THE FIELD)

Casualties

Fatalities0
Injuries0

Costs

Property Damage$336,199
Emergency Response$555,587
Other Costs$0

Location Map

Incident Narrative

"WHILE PERFORMING A PLANNED DIG OF AN IDENTIFIED ANOMALIES, BUCKEYE PERSONNEL ENCOUNTERED AN APPARENT ODOR AT THE EXCAVATION SITE. THEY REPORTED IT TO THE CONTROL CENTER AND THE PIPELINE WAS IMMEDIATELY SHUT DOWN. INTERNAL AND EXTERNAL NOTIFICATIONS WERE COMPLETED. OUT OF AN ABUNDANCE OF CAUTION, AN NRC NOTIFICATION WAS MADE. THE PIPELINE WAS EXPOSED AND NO FREE PRODUCT WAS OBSERVED. UPON FURTHER INVESTIGATION, A SMALL CALCARIOUS DEPOSIT WAS FOUND IN THE COATING ON THE BOTTOM SIDE OF THE PIPE WHERE THE DIG ANOMALY WAS LOCATED AND REPAIRED. THE LINE WAS PUT BACK IN SERVICE."