ONEOK NGL PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorONEOK NGL PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates34.18886, -96.48463

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT APPROXIMATELY 08:21 ON OCTOBER 16TH, 2017, ONEOK PIPELINE CONTROL RECEIVED A CALL FROM THE ONEOK CONTRACT INSPECTOR WORKING WITH THE NDE TEAM AT THE ONEOK BLUE RIVER PUMP STATION. THE INSPECTOR HAD IDENTIFIED AND AN ICE BALL AND VAPORS COMING FROM A WELD-O-LET FOR THE 1"" FLARE LINE ON THE DISCHARGE PIPING OF THE PUMP. THE PUMP SUCTION VALVE AND DISCHARGE VALVE HAD PREVIOUSLY BEEN CLOSED WHICH ISOLATED THE FAILURE. OPERATIONS PERSONNEL RESPONDED TO THE SITE AND LOCKED-OUT THE PUMP PIPING AND DE-PRESSURED THE PIPING. THIS PIPING HAD BEEN PREVIOUSLY EXCAVATED AND THE COATING REMOVED TO ALLOW FOR A NDE EXAMINATION. THE EXPOSED 1"" FLARE PIPING CONNECTED TO THE WELD-O-LET HAD BEEN LEFT UNSUPPORTED WHICH ALLOWED THE WELD-O-LET TO FAIL. THE DISCHARGE PIPING WITH THE CRACKED WELD-O-LET WAS REMOVED AND REPLACED WITH NEW PRE-TESTED PIPE WITH A NIPPLE-O-LET INSTALLED. THE PUMP STATION HAS BEEN ISOLATED FROM THE PIPELINE AND HYDROCARBONS EVACUATED UNTIL ALL NDE TESTING IS COMPLETE. EDITED 5/17/2018 BY N. JONES THE PUMP STATION WAS RETURNED TO SERVICE ON 3/01/2017 AT 17:00 HRS. FOLLOWING THE COMPLETION OF THE NDE TESTING AND ADDITIONAL MAINTENANCE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in