COLONIAL PIPELINE CO
hazardous_liquid Incident — — February 27, 2019
Incident Information
| Incident Date | February 27, 2019 |
| Operator | COLONIAL PIPELINE CO |
| Commodity | REFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 29.89559, -89.72553 |
Cause
| Cause | INCORRECT OPERATION |
| Subcause | OTHER INCORRECT OPERATION |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $0 |
| Emergency Response | $4,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"A CONSTRUCTION CREW WAS PREPARING A TIE-IN POINT TO A NEWLY CONSTRUCTED SEGMENT OF PIPE ON LAKE BORGNE IN LOUISIANA. WHILE PUMPING WATER INTO THE EXISTING PIPE TO REMOVE AN AIR POCKET AND REDUCE BUOYANCY, A SLUG OF WATER AND RESIDUAL KEROSENE WERE RELEASED FROM THE OPEN END OF THE PIPE INTO THE LAKE. THE PIPE WAS RAISED TO PREVENT ANY ADDITIONAL RELEASE OF PRODUCT-CONTAMINATED WATER. CONTAINMENT BOOMS THAT HAD BEEN DEPLOYED AROUND THE WORK BARGES AND PIPE FLOATS PRIOR TO THE INCIDENT CONTAINED THE SPILL. CONSTRUCTION WORKERS AND ON-SITE OSRO PERSONNEL IMMEDIATELY DEPLOYED SPILL KITS AND BEGAN CLEAN UP AND SPILL PREVENTION ACTIVITIES. THE AFFECTED AREA WAS APPROXIMATELY 25 X 25 FEET ON THE WATER. ALL CLEAN UP ACTIVITY WAS COMPLETED THE FOLLOWING DAY."
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.