"PLAINS PIPELINE, L.P."

hazardous_liquid Incident — — July 23, 2019

Incident Information

Incident DateJuly 23, 2019
Operator"PLAINS PIPELINE, L.P."
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.71764, -103.59230

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$200
Emergency Response$20,000
Other Costs$0

Location Map

Incident Narrative

"APPROXIMATELY 14 BARRELS OF CRUDE OIL WERE RELEASED WITHIN FACILITY BOUNDARIES. THE DATE AND TIME OF THE RELEASE (07/23/2019 AT 16:30) IS INDICATIVE OF THE EARLIEST POSSIBLE TIME THE RELEASE COULD HAVE STARTED, AS IT WAS THE LAST TIME THE LOCATION HAD BEEN VISITED AND CONFIRMED THAT NO CRUDE OIL WAS BEING RELEASED. THE RELEASE WAS CAUSED BY THE DOUBLE BLOCK AND BLEED VALVE (BODY NEEDLE VALVE) NOT PROPERLY SEATING, AND ITS SECONDARY RELEASE CONTROL (THE PLUG AT THE END OF THE TUBING FROM THE BODY BLEED) FAILING BECAUSE THE FERRULE, WHICH WOULD HAVE ENGAGED THE COMPRESSION OF THE FITTING, WAS NOT INSTALLED DURING NEW CONSTRUCTION. ADDITIONALLY, STATION REPAIRS WERE COMPLETED BEFORE RESTART WAS REQUIRED UNDER NORMAL OPERATING PROCEDURES. PLAINS HAS SINCE REPLACED THE VALVE AND TUBING ASSOCIATED TO PREVENT FUTURE RELEASES. SUPPLEMENTAL NARRATIVE: UPDATE WAS MADE TO PART B, Q5-COUNTY OR PARISH."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in