"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident — — September 24, 2019

Incident Information

Incident DateSeptember 24, 2019
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates41.52290, -104.90965

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$500
Emergency Response$1,000
Other Costs$0

Location Map

Incident Narrative

"DURING AN INSPECTION AT THE BRISTOL RIDGE VALVE SITE, PRODUCT WAS OBSERVED AT THE PACKING GLAND FITTING LOCATED ON THE MAINLINE BLOCK VALVE. OPERATIONS CONTROL WAS NOTIFIED AND PIPELINE SHUTDOWN PROCEDURES WERE INITIATED. MAINLINE BLOCK VALVES UPSTREAM AND DOWNSTREAM OF THE RELEASE WERE CLOSED. THE RELEASE ORIGINATED FROM A CRACK ON THE 1/2"" PACKING GLAND FITTING LOCATED ON THE BLOCK VALVE. THE MAINLINE WAS DRAINED UP AND A NEW 1/2"" BALL VALVE AND PLUG WERE INSTALLED. RESULTS OF THE FAILURE ANALYSIS INDICATE THE FAILED COMPONENT WAS A NON-OEM FITTING AND AS SUCH, THE CONFIGURATION OF THE FITTING ALLOWED THE AFTERMARKET ADAPTER TO BE INSERTED TOO FAR INTO THE PACKING FITTING WHICH RESULTED IN OVERTIGHTENING. THE OVERTIGHTENING CAUSED A CRACK IN THE NON-OEM FITTING. INSTALLATION OF THE 1/2"" BALL VALVE AND PLUG ELIMINATES THE NEED FOR THIS ADAPTER FITTING. SUPPLEMENTAL/FINAL (02/20/2020): UPDATED D-8A, D-8D, G6-6 AND H SUPPLEMENTAL/FINAL (03/23/2020): UPDATED PART D-6"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.