"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — January 2, 2020

Incident Information

Incident DateJanuary 2, 2020
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.12201, -94.43841

Cause

CauseINCORRECT OPERATION
SubcauseEQUIPMENT NOT INSTALLED PROPERLY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$4,889
Emergency Response$40,718
Other Costs$0

Location Map

Incident Narrative

"ON THE MORNING OF JANUARY 2, 2020 DURING FACILITY ROUNDS AT SUGAR CREEK TERMINAL A TERMINAL OPERATOR DISCOVERED A RELEASE OF PREMIUM GASOLINE THAT WAS COMING FROM A FLANGE ON THE BRIDGE ON THE OUTBOUND LINE FROM TANK 338. THE PRODUCT RELEASED IS ESTIMATED TO BE AROUND HALF A BARREL OF PREMIUM GASOLINE. THE ROOT CAUSE WAS FOUND TO BE AN IMPROPER INSTALLATION OF A GASKET. THE RELEASE WAS CLEANED UP PROMPTLY."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.