STATELINE CRUDE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorSTATELINE CRUDE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates31.96793, -103.86582

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

FOLLOWING A LOCALIZED POWER OUTAGE RESULTING IN THE LOSS OF SCADA COMMUNICATIONS AND THE SUBSEQUENT CLOSURE OF DOWNSTREAM OUTLETS (TERMINAL TANKAGE AND DOWNSTREAM PIPELINES), THE MANUAL OPERATION OF A FLOWBACK PUMP ALLOWED THE SYSTEM TO OVERPRESSURE RESULTING IN THE FAILURE OF A INSULATING KIT ON A PIPELINE FLANGE. THE CLOSURE OF DOWNSTREAM OUTLETS, AUTOMATED SHUTDOWN OF ALL SYSTEM PUMPS AND HANDOVER OF CONTROL TO LOCAL OPERATIONS IS NORMAL OPERATING PROCEDURE FOR ALL CONTROL ROOM PERSONNEL DURING POWER OUTAGES RESULTING IN LOSS OF SCADA COMMUNICATIONS. IN THIS SITUATION, A CONTRACTOR WORKING FOR WPX ENERGY UPSTREAM OF STATELINE CRUDE, LLC OVERRODE THE AUTOMATIC SHUTDOWN OF A PUMP DURING FLOWBACK OPERATIONS WHICH RESULTED IN THE OVER-PRESSURIZATION WHEN DOWNSTREAM OUTLETS WERE CLOSED. THIS CONTRACTOR WAS NOT DOING WORK FOR STATELINE CRUDE, LLC AND WAS NOT HIRED BY STATELINE CRUDE, LLC. THE FAILURE INVESTIGATION FOUND THAT STATELINE CRUDE, LLC HAD INADEQUATE PROCEDURES REGARDING PRODUCERS HAVING ACCESS TO ITS PLC'S. STATELINE CRUDE, LLC HAS CHANGED THE PROCEDURES SO NOW ONLY COMPANY PERSONNEL HAVE ACCESS TO OVERPRESSURE SHUTDOWNS ON PUMPS.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in