"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident — — March 2, 2020

Incident Information

Incident DateMarch 2, 2020
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates38.20944, -95.05178

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseORIGINAL MANUFACTURING-RELATED (NOT GIRTH WELD OR OTHER WELDS FORMED IN THE FIELD)

Casualties

Fatalities0
Injuries0

Costs

Property Damage$40,000
Emergency Response$182,000
Other Costs$0

Location Map

Incident Narrative

"ON MARCH 2, 2020, WHILE TRAVELING TO AN ILI REHAB SITE, CONTRACTORS IDENTIFIED DEAD VEGETATION NEAR THE PIPELINE. THE CONTRACTORS NOTIFIED THE MAGELLAN OPERATIONS CONTROL CENTER AND SHUTDOWN PROCEDURES WERE INITIATED FOR ALL THREE LINES IN THE AREA. LOCAL PERSONNEL ARRIVED ONSITE AND CONTRACTORS BEGAN EXCAVATION. AT 15:23, A PINHOLE WAS DISCOVERED IN THE SEAM AT THE 11:35 O'CLOCK POSITION. TYPE B SLEEVE WAS INSTALLED AND CLEANUP ACTIVITIES WERE INITIATED. THE PIPE JOINT WAS CUT OUT JUNE 17, 2020 AND SENT IN FOR METALLURGICAL ANALYSIS AND RESULTS INDICATE THE LEAK WAS DUE TO A SHORT, THROUGH WALL, MANUFACTURING DEFECT (PENETRATOR) LOCATED AT THE ERW SEAM WELD. LIGHT EXTERNAL CORROSION AT THE LEAK LOCATION MAY HAVE BEEN A CONTRIBUTING FACTOR. NO INDICATIONS OF IN-SERVICE GROWTH OR FATIGUE WERE OBSERVED. SUPPLEMENTAL/FINAL:(10/28/2020) PARTS A11, G5, H UPDATED."