DIXIE PIPELINE COMPANY LLC

hazardous_liquid Incident — — March 3, 2020

Incident Information

Incident DateMarch 3, 2020
OperatorDIXIE PIPELINE COMPANY LLC
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates32.56914, -85.89598

Cause

CauseNATURAL FORCE DAMAGE
SubcauseLIGHTNING

Casualties

Fatalities0
Injuries0

Costs

Property Damage$3,000
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

"AT 09:25 PIPELINE CONTROL CENTER (HCC) RESPONDED TO A TRANSMITTER FAILURE AT MP 599.83 WITH NO UPSTREAM OR DOWNSTREAM PRESSURE DEVIATIONS. HCC DISPATCHED PERSONNEL TO THE SITE FOR FURTHER INVESTIGATION. AT 13:10 A TECHNICIAN NOTIFIED HCC OF A SMALL FIRE ON A TRANSMITTER AND ASSOCIATED STAINLESS STEEL TUBING. THE TECHNICIAN WAS ABLE TO CLOSE A MANUAL INSTRUMENTATION VALVE TO ISOLATE THE TRANSMITTER AND EXTINGUISH THE FIRE. AN INVESTIGATION DETERMINED THAT SEVERE THUNDERSTORMS PASSED THROUGH THE AREA AT MP 599.83 MAINLINE VALVE SITE. WEATHER SERVICE DATA INDICATES SEVERAL LIGHTNING STRIKES IN CLOSE PROXIMITY TO THE PIPELINE AND VALVE SITE. IT WAS DETERMINED THAT AS THE LIGHTNING DISSIPATED THE ELECTRICAL CURRENT INTO THE GROUND, THE CURRENT SURGE WAS INDUCED ONTO THE DIXIE MAINLINE, TRAVELING TOWARD THE VALVE SITE AND COMPROMISED THE INTEGRITY OF THE SWAGELOK DIELECTRIC TUBING FITTINGS. THE SWAGELOK DIELECTRIC TUBING FITTINGS WILL BE REPLACED WITH A 2 INCH FLANGE AND PIKOTEK INSULATING KIT. A GROUNDING DAIRYLAND DECOUPLER WILL ALSO BE INSTALLED TO ISOLATE STRAY CURRENT FROM DOWNSTREAM COMPONENTS. 48 HOUR NRC UPDATE #1272771 WAS PLACED ON MARCH 5, 2020 AT 11:05."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in