"COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC"

hazardous_liquid Incident — — April 7, 2020

Incident Information

Incident DateApril 7, 2020
Operator"COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC"
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates35.33987, -96.97866

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$10,000
Emergency Response$27,000
Other Costs$20,000

Location Map

Incident Narrative

"A FARMER PUNCTURED THE PIPELINE WHILE HE WAS INSTALLING A TIN HORN DRAINAGE. CVR WAS ABLE TO CONTAIN THE OIL TO A SMALL AREA. PIPELINE WAS SHUTDOWN UNTIL REPAIRS WERE COMPLETED. CVR CUT OUT A 10' SECTION OF THE PIPELINE AND REPLACED IT WITH PRETESTED 8.625"" .322"" API-5L X52 FBE COATED PIPE. WELDING QUALIFICATIONS AND WELDING PROCEDURES WERE IN A ACCORDANCE WITH API 1104 (LATEST IBR) AND BOTH ENDS WERE X-RAYED IN ACCORDANCE WITH 195.234."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in