"PLAINS PIPELINE, L.P."

hazardous_liquid Incident — — May 14, 2020

Incident Information

Incident DateMay 14, 2020
Operator"PLAINS PIPELINE, L.P."
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.42280, -102.32720

Cause

CauseINCORRECT OPERATION
Subcause"VALVE LEFT OR PLACED IN WRONG POSITION, BUT NOT RESULTING IN A TANK, VESSEL, OR SUMP/SEPARATOR OVERFLOW OR FACILITY OVERPRESSURE"

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$2,670
Other Costs$0

Location Map

Incident Narrative

"APPROXIMATELY 50 BARRELS OF CRUDE OIL WERE RELEASED WITHIN FACILITY BOUNDARIES FROM A RECEIVER AT CRANE EAST STATION. THE DATE AND TIME OF THE RELEASE (05/14/2020 AT 13:15), THIS BEING INDICATIVE OF THE EARLIEST POSSIBLE TIME THE RELEASE COULD HAVE STARTED, BECAUSE IT WAS THE LAST TIME THE INCIDENT LOCATION HAD BEEN VISITED BY A PLAINS OPERATOR, AND THE OPERATOR CONFIRMED NO CRUDE OIL WAS BEING RELEASED. THE CAUSE OF THE INCIDENT WAS DETERMINED TO BE INCORRECT OPERATION OF A 2"" DRAIN LINE BALL VALVE ON THE PIG RECEIVER. THE VALVE WAS LEFT OPEN IN PREPARATION FOR RECEIVING A PIG, SUBSEQUENTLY RESULTING IN THE RELEASE. TO STOP THE ANY FURTHER RELEASE OF CRUDE OIL, THE 2"" BALL VALVE WAS CLOSED. SUPPLEMENTAL NARRATIVE: TO MITIGATE FUTURE RELEASES, EMPLOYEES IN THE PLAINS DISTRICT WHERE THE INCIDENT OCCURRED WILL BE RE-TRAINED ON PIGGING PROCEDURES."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in