ENBRIDGE STORAGE (CUSHING) L.L.C.

hazardous_liquid Incident — — December 4, 2018

Incident Information

Incident DateDecember 4, 2018
OperatorENBRIDGE STORAGE (CUSHING) L.L.C.
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates35.94063, -96.74844

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$8,368
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

ON DECEMBER 4, 2018 AT APPROXIMATELY 20:10 CST, A MINOR IGNITION OF FLAMMABLE VAPORS OCCURRED DURING A FLANGE REPLACEMENT PROJECT ON THE ENTERPRISE MANIFOLD WHERE THE 24"" PIPELINE TRANSFERS PRODUCT FROM ENBRIDGE MANIFOLD 226 INTO THE SEAWAY 1 PIPELINE SYSTEM. THIS EVENT OCCURRED WHILE PIPELINE MAINTENANCE PERSONNEL WERE CUTTING THE 24"" PIPELINE WITH A CUTTING TORCH. A VAPOR BARRIER TOOL AND MUD HAD BEEN INSTALLED IN THE PIPELINE IN AN EFFORT TO ISOLATE THE AREA FROM FLAMMABLE VAPORS. A VENT LINE WAS ADDITIONALLY INSTALLED AND ROUTED 50-60 FEET AWAY PRIOR TO BEGINNING THE CUTTING PROCESS. THE WORK AREA HAD PREVIOUSLY BEEN SHUT DOWN/ISOLATED AS PART OF THE PROJECT PLAN. THE CAUSE OF THE IGNITION WAS DETERMINED TO BE ESCAPING VAPORS DUE TO THE IMPROPER INSTALLATION OF THE THREADED VENT PIPE CONNECTION. NO INJURIES OR RELEASE OF PRODUCT OCCURRED AS A RESULT OF THE EVENT. THE NRC WAS NOTIFIED OF THE VAPOR IGNITION ON DECEMBER 4, 2018 AT 20:56 CST (#1232055) AND THE 48-HOUR FOLLOW-UP CALL WAS MADE ON DECEMBER 5, 2018 AT 08:36 CST (#1232075).

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.