DCP MIDSTREAM
hazardous_liquid Incident — — July 16, 2020
Incident Information
| Incident Date | July 16, 2020 |
| Operator | DCP MIDSTREAM |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 29.06306, -95.75596 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $18,000 |
| Emergency Response | $0 |
| Other Costs | $0 |
Location Map
Incident Narrative
"ON 07/16/2020, AT 7:41 AM, DCP FIELD TECHNICIAN IDENTIFIED A LEAK IN A VALVE BODY BYPASS NIPPLE OF SWEENY METER STATION. AFTER THE CONFIRMED DISCOVERY OF THE LEAK, A PLAN WAS PUT INTO PLACE TO LAUNCH A 24 INCH PIG TO DISPLACE THE NGL BACK INTO THE SAHI MAINLINE. ONCE THE PIG WAS LAUNCHED AT 1:33 AM, 07/17/2020, IT ISOLATED THE LEAK DUE TO N2 BEING BEHIND THE PIG. IT WAS DETERMINED THAT THE PROVIDED VALVE FROM THE MANUFACTURER HAD A DEFECTIVE THREADED NIPPLE WHICH CAUSED LEAK. AS A CORRECTIVE ACTION, DCP WAS PROVIDED A NEW VALVE FROM THE MANUFACTURER AND WAS INSTALLED AT THE METER STATION."