"COUNTRYMARK REFINING AND LOGISTICS, LLC"

hazardous_liquid Incident — — August 11, 2020

Incident Information

Incident DateAugust 11, 2020
Operator"COUNTRYMARK REFINING AND LOGISTICS, LLC"
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates38.59840, -88.36041

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY OPERATOR (FIRST PARTY)

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$10,722
Other Costs$0

Location Map

Incident Narrative

"ON AUGUST 11TH PIPELINE MAINTENANCE CREWS WERE WORKING ON A SMALL PIPELINE REPLACEMENT ON THE CLAY CITY 6"" MAINLINE. CREWS WERE DITCHING-IN FOR THE REPLACEMENT PARALLEL TO THE EXISTING ACTIVE PIPELINE. AN UNKNOWN INACTIVE INJECTION WAS HIT AS THE EXCAVATOR WAS DITCHING IN THE REPLACEMENT PIPELINE. THIS INJECTION WAS WELDED TO THE ACTIVE MAINLINE AND WAS RIPPED OUT BY THE TRACKHOE. THIS CAUSED THE MAINLINE TO BEGIN LEAKING. THE PIPELINE PUMPS SHUT DOWN IMMEDIATELY ON LOW PRESSURE KILL. ON-SITE PERSONNEL IMMEDIATELY BEGAN EMERGENCY RESPONSE PROCEDURES. THE CONTROL ROOM CLOSED THE UPSTREAM REMOTE-CONTROL VALVE AFTER BEING NOTIFIED OF THE INCIDENT BY MAINTENANCE PERSONNEL. THE DOWNSTREAM MANUAL VALVE WAS CLOSED BY MAINTENANCE PERSONNEL APPROXIMATELY 20 MINUTES AFTER THE ACCIDENT. THE CRUDE OIL WAS CONTAINED ENTIRELY IN THE EXCAVATED DITCH. ON-SITE PERSONNEL BEGAN RECOVERY EFFORTS AND ADDITIONAL RESOURCES WERE CALLED TO HELP WITH CLEANUP EFFORTS. THE PIPELINE REMAINED SHUTDOWN UNTIL THE REPLACEMENT WAS COMPLETED THE FOLLOWING DAY. A ROOT CAUSE ANALYSIS IS IN PROCESS. THE REPORT WILL BE UPDATED WITH THE FINDINGS FORM THE ANALYSIS AFTER COMPLETION. THE ROOT CAUSE ANALYSIS WAS REVIEWED AND ACCEPTED ON SEPTEMBER 28, 2020. THREE ACTION ITEMS WERE IDENTIFIED; REVIEW ILI DATA TO IDENTIFY ANY POSSIBLE TAPS OR APPURTENANCES FOR ALL PIPELINES, SURVEY THE ABANDONED PIPELINE AND INCLUDE ON OUR MAPS, PROVIDE ALIGNMENT SHEETS TO CONSTRUCTION CREWS AS NECESSARY."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in