BUCKEYE PARTNERS, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBUCKEYE PARTNERS, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates39.00906, -89.17924

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

WHILE PERFORMING A PLANNED DIG OF AN IDENTIFIED ANOMALIES, BUCKEYE PERSONNEL ENCOUNTERED AN APPARENT ODOR AT THE EXCAVATION SITE. THEY REPORTED IT TO THE CONTROL CENTER AND THE PIPELINE WAS IMMEDIATELY SHUT DOWN. INTERNAL AND EXTERNAL NOTIFICATIONS WERE COMPLETED. OUT OF AN ABUNDANCE OF CAUTION, AN NRC NOTIFICATION WAS MADE. THE PIPELINE WAS EXPOSED AND NO FREE PRODUCT WAS OBSERVED. UPON FURTHER INVESTIGATION, A SMALL CALCARIOUS DEPOSIT WAS FOUND IN THE COATING ON THE BOTTOM SIDE OF THE PIPE WHERE THE DIG ANOMALY WAS LOCATED AND REPAIRED. THE LINE WAS PUT BACK IN SERVICE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in