ENTERPRISE PRODUCTS OPERATING LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENTERPRISE PRODUCTS OPERATING LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates35.48580, -106.71530

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 11:08 MST ON 4/16/2019, INTEGRITY REHAB EXCAVATING CREW DISCOVERED A SMALL PINHOLE LEAK IN BOTTOM OF GIRTH WELD AFTER SANDBLASTING THE PIPE FOR INSPECTION. THE PIPE SEGMENT WAS SHUT DOWN AND A PLIDCO SLEEVE WAS APPLIED OVER THE WELD TO STOP THE LEAK. THE PIPE SEGMENT REMAINED OUT OF SERVICE UNTIL THE FEATURE WAS CUT OUT AND A REPLACEMENT PIPE WAS INSTALLED ON 9/18/2019. VISUAL EXAMINATION OF THE GIRTH WELD CONFIRMED A CONSTRUCTION WELD BURN THROUGH AS THE CAUSE OF THE LEAK. AN INITIAL NRC CALL WAS MADE ON 4/16/2019 AT 12:06 MST BASED ON THE ESTIMATION FOR REPAIRS TO EXCEED $50,000; NRC #1242899. A 48-HOUR NRC UPDATE CALL WAS MADE ON 4/18/2019 AT 07:35 MST; NRC #1243070.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in