ENTERPRISE PRODUCTS OPERATING LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENTERPRISE PRODUCTS OPERATING LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.41490, -95.32530

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 5/16/19, ENTERPRISE PIPELINE TECHNICIAN OBSERVED VAPOR COMING FROM THE ISOLATION VALVE FLANGE FROM THE MAINLINE TO A FUTURE PUMP STATION. THE TECHNICIAN CHECKED THE PIPING PRESSURE AND DISCOVERED THAT THE PRESSURE EXCEEDED MOP. PIPING SEGMENT WAS BLOWN DOWN AND THE CLOSED SEGMENT OF STATION PIPING WAS OPENED. DURING THE INVESTIGATION IT WAS DISCOVERED THAT THE VALVE BODY CAVITY THERMAL RELIEF SYSTEM HAD BEEN INSTALLED TO RELIEVE INTO THE CLOSED SEGMENT OF STATION PIPING RATHER THAN THE MAINLINE. THE DECISION WAS MADE TO REPLACE THE VALVE WHICH TRIGGERED THE NRC REPORTING CRITERIA FOR COSTS EXCEEDING $50,000. INITIAL NRC NOTIFICATION MADE ON 5/20/19 IS #1246279 AND 48 HOUR NRC UPDATE MADE ON 5/22/19 IS #1246508.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in