BKEP CRUDE, LLC

hazardous_liquid Incident — — June 3, 2019

Incident Information

Incident DateJune 3, 2019
OperatorBKEP CRUDE, LLC
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates35.51847, -101.91335

Cause

CauseEQUIPMENT FAILURE
SubcauseMALFUNCTION OF CONTROL/RELIEF EQUIPMENT

Casualties

Fatalities0
Injuries0

Costs

Property Damage$250
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

DURING PIPELINE STARTUP THE BACKPRESSURE VALVE DIAPHRAGM FAILED. EDDY HOBBS FROM BKEP WAS ONSITE AND DISCOVERED THE RELEASE. SCOUT (FAIN PLANT OWNER) CALLED OUT RED J SERVICES, LLC (PO BOX 52408 AMARILLO, TX 79159) TO HANDLE CLEANUP AS THEY ARE THE SITE OWNER. CLEANUP WAS COMPLETED ON THE SAME DAY AS THE RELEASE. BKEP REPLACED THE RUPTURED DIAPHRAGM AND RETURNED THE LINE TO SERVICE. BKEP HAS EVALUATED THE NEED FOR MORE FREQUENT INSPECTIONS. GOING FORWARD, VALVES IN THE SYSTEM WITH THIS TYPE OF DIAPHRAGM WILL HAVE A MORE FREQUENT INSPECTION SCHEDULE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in