PHILLIPS 66 PIPELINE LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | PHILLIPS 66 PIPELINE LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 34.05966, -98.34930 |
Cause
| Cause | CORROSION FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON JULY 10 AT APPROXIMATELY 15:45 PM, THE OK-01 MAINLINE PUMP AT WICHITA FALLS, TX SHUTDOWN ON LOW SUCTION. INITIAL SCADA INFORMATION INDICATED A RELEASE THAT WAS CONFIRMED BY AERIAL PATROL AT 19:04. PIPELINE WAS SHUTDOWN AT 16:05 AND ISOLATED VIA MOV'S. FAILED SECTION WAS REPLACED AND LINE WAS RETURNED TO SERVICE ON 7-14-2019 AT APP. 20:30. FINAL FAILURE CAUSE TO BE DETERMINED BY 3RD PARTY METALLURGICAL ANALYSIS. 2019-8-21 UPDATED PART ""C"" WITH LENGTH OF SEAM SPLIT IN INCHES INSTEAD OF FEET. UPDATED PART ""D"" WITH UPDATED COST INFORMATION. UPDATED PART ""G"" WITH CAUSE INFORMATION BASED ON RECEIPT OF METALLURGICAL ANALYSIS PRELIMINARY REPORT ON 8-14-2019. 2019-9-19 SUPPLEMENTAL - UPDATED GPS COORDINATES PER PHMSA REQUEST. 2019-10-9 SUPPLEMENTAL/FINAL REPORT - UPDATED PART D, COST INFORMATION. FINALIZED REPORT BASED ON RECEIPT OF METALLURGICAL TESTING FINAL REPORT 9-20-2019. UPDATED PART E WITH PRESSURE AT THE FAILURE LOCATION.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.