BUCKEYE PARTNERS, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBUCKEYE PARTNERS, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates40.56093, -74.25274

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 7/18/2019 AT 14:30 A BUCKEYE CONTRACTOR WORKING AT PORT READING NOTICED GASOLINE LEAKING FROM A NEARBY PIPE SECTION ON THE 24 INCH CARGO LINE IN THE 1210 TANK FIELD. THEY IMMEDIATELY CONTACTED LOCAL OPERATIONS. THE RELEASE WAS IMMEDIATELY CONTAINED AND THE LINE WAS ISOLATED AND DRAINED UNTIL FURTHER INVESTIGATION INTO THE ROOT CAUSE COULD BE CONDUCTED. REMEDIATION AND ALL CONTAMINATED SOIL AND STONE WAS PROPERLY REMOVED. A VISUAL INSPECTION OF THE PIPE WAS COMPLETED AND CONCLUDED THAT THE ABOVE GROUND PIPE SEGMENT SHOWED SMALL AREAS OF LOCALIZED PITTING IN THE COATING WHICH HAS CONTRIBUTED TO THE RELEASE. THE REPAIR PLAN INCLUDES REPLACING A TOTAL OF APPROXIMATELY 60 FEET OF PIPE AND FITTINGS. THE PIPE WILL BE FABRICATED, X-GRAYED, HYDRO-STATICALLY TESTED AND INSTALLED. THE EXISTING PIPE SECTION WILL BE COLD CUT AND REMOVED.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.