HOLLY ENERGY PARTNERS - OPERATING, L.P.

hazardous_liquid Incident —

Incident Information

Report Date
OperatorHOLLY ENERGY PARTNERS - OPERATING, L.P.
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates31.74322, -106.27215

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

THE PIPELINE WAS SHUT DOWN AT 10:20 AM FOR CALIBRATIONS TO TRANSMITTERS AT MULTIPLE FACILITIES AS PER HEP PROCEDURE. IN THE TIME THE LINE WAS DOWN AND BLOCKED IN THE THERMAL STRESS EXHIBITED FROM THE EXTREME TEMPERATURES IN EL PASO CAUSED AN ISOLATED SECTION OF THE PIG TRAP TO BE SUBJECTED TO THERMAL STRESS CAUSING THE O-RING TO FAIL. THE FAILURE WAS IDENTIFIED WHEN HEP PERSONNEL ARRIVED ON-SITE FOR CALIBRATIONS AT 16:43 ON JULY 29, 2019.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.