ONEOK NGL PIPELINE, LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | ONEOK NGL PIPELINE, LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 36.77402, -97.75716 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON 10/22/19 AT 3:50 AM, PLANT OPERATORS IDENTIFIED VAPOR LEAKING FROM A 3/4"" THREADED NIPPLE ON STERLING 2 PUMP HEADER. PUMP HEADER ISOLATED AND PRODUCT REMOVED. ONEOK REPLACED FAILED 3/4"" NIPPLE AND ASSOCIATED BALL VALVE. PIPELINE WAS RETURNED TO SERVICE. ONEOK DETERMINED PIPE NIPPLE FAILED DUE TO HIGH CYCLE FATIGUE (VIBRATION) CAUSED BY THE PIPELINE CONTROL VALVE. ONEOK CONDUCTED VIBRATION STUDY AFTER INSTALLATION OF NEW PIPELINE CONTROL VALVE AND VIBRATION WAS REDUCED TO AN ACCEPTABLE LEVEL. ADDITIONALLY, ONEOK REPLACED ALL SIMILAR THREADED NIPPLES ON THE STERLING 2 PIPELINE HEADER SYSTEM.