ONEOK NGL PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorONEOK NGL PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates36.77402, -97.75716

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 10/22/19 AT 3:50 AM, PLANT OPERATORS IDENTIFIED VAPOR LEAKING FROM A 3/4"" THREADED NIPPLE ON STERLING 2 PUMP HEADER. PUMP HEADER ISOLATED AND PRODUCT REMOVED. ONEOK REPLACED FAILED 3/4"" NIPPLE AND ASSOCIATED BALL VALVE. PIPELINE WAS RETURNED TO SERVICE. ONEOK DETERMINED PIPE NIPPLE FAILED DUE TO HIGH CYCLE FATIGUE (VIBRATION) CAUSED BY THE PIPELINE CONTROL VALVE. ONEOK CONDUCTED VIBRATION STUDY AFTER INSTALLATION OF NEW PIPELINE CONTROL VALVE AND VIBRATION WAS REDUCED TO AN ACCEPTABLE LEVEL. ADDITIONALLY, ONEOK REPLACED ALL SIMILAR THREADED NIPPLES ON THE STERLING 2 PIPELINE HEADER SYSTEM.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in