BAYOU BRIDGE PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBAYOU BRIDGE PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.10774, -91.79631

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

TECHS ARRIVED AT ST. MARTINVILLE STATION AT APPROXIMATELY 7:25AM ON 11/11/19 TO PERFORM ROUTINE STATION CHECK. UPON STATION ENTRY A SMALL DIAMETER TUBING CONNECTION FAILURE ON TOP OF PUMP 2120 WAS DISCOVERED AND CRUDE WAS MISTING FROM THIS POINT. THE PERSONNEL NOTIFIED CONSOLE 4 TO SHUT THE PUMP DOWN. THE PERSONNEL THEN ISOLATED THE PUMP AND ASSESSED THE AMOUNT RELEASED. APPROXIMATELY 1 BARREL OF CRUDE WAS RELEASED. A THIRD PARTY WAS CONTACTED TO HELP WITH THE CLEANUP EFFORTS. THE AREA WAS CLEANED UP AND NEW SOIL AND ROCK WAS BROUGHT IN. THE CONTAMINATED SOIL AND ROCK WAS COLLECTED AND HAULED OFF FOR PROPER DISPOSAL. UPON FURTHER INVESTIGATION THE CAUSE OF THE RELEASE WAS DETERMINED THAT THE TUBING FITTING HAD BE OVER TIGHTENED DURING CONSTRUCTION EARLIER IN 2019. THIS RESULTED IN THE SEALING POINT OF THE FITTING MUSHROOMING OUT AND COMBINED WITH THE VIBRATIONS OF THE PUMP THE TUBING CRACKED AT THE FERAL SEALING POINT. OTHER SMALL DIAMETER TUBING CONNECTIONS WERE CHECKED IN THE STATION FOR SIMILAR CIRCUMSTANCES.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in