DIXIE PIPELINE COMPANY LLC

hazardous_liquid Incident — — November 22, 2019

Incident Information

Incident DateNovember 22, 2019
OperatorDIXIE PIPELINE COMPANY LLC
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates30.49630, -91.56127

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$115,000
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

ON 11:50 ON NOVEMBER 22, 2019, ENTERPRISE EMPLOYEE IDENTIFIED A SMALL PROPANE LEAK ON THE PACKING OF THE VALVE AT MARINGOUIN VALVE STATION THAT RESULTED IN 4 GALLONS BEING RELEASED. A THIRD-PARTY COMPANY TRIED TO MITIGATE THE LEAK WITH REPACKING THE VALVE, BUT WAS UNSUCCESSFUL. AT 22:15, IT WAS DETERMINED THAT THE VALVE REPLACEMENT WAS THE BEST REPAIR OPTION AND WOULD EXCEED $50,000 MAKING IT A REPORTABLE NRC LEAK. THE PIPELINE WAS PURGED IN NITROGEN IN ORDER TO REPLACE THE VALVE BEFORE RETURNING TO SERVICE. INITIAL NRC CALL WAS PLACED ON NOVEMBER 22, 2019 AT 22:30. 48 HOUR NRC UPDATE #1264771 WAS PLACED ON NOVEMBER 24, 2019 AT 11:07. INVESTIGATION OF THE VALVE DETERMINED THE INJECTOR VALVE PACKING PIPING CRACKED WHILE ADDING MORE PACKING TO THE VALVE STEAM. THIS PART COULD NOT BE REPLACED SAFELY DUE TO THE VALVE BODY NOT BLEEDING TO ZERO PRESSURE. THE PIPELINE WAS SHUTDOWN FOR A TOTAL OF 44HRS.