MARATHON PIPE LINE LLC

hazardous_liquid Incident — — July 22, 2021

Incident Information

Incident DateJuly 22, 2021
OperatorMARATHON PIPE LINE LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates42.20805, -104.51374

Cause

CauseINCORRECT OPERATION
SubcauseWRONG EQUIPMENT SPECIFIED OR INSTALLED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$2,590
Other Costs$2,590

Location Map

Incident Narrative

"FORT LARAMIE STATION WAS DOWN FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES ASSOCIATED WITH FLOW REVERSAL PROJECT. MAINLINE PIPE ASSOCIATED WITH THIS PORTION OF THE SYSTEM WAS PURGED AND IDLED FOR PROJECT BETWEEN PIG TRAPS. UNDERGROUND STATION PIPE BETWEEN ORIGINAL PIG TRAP LOCATION AND NEW TRAP LOCATION HAD NOT BEEN COMPLETELY PURGED. STATION PIPE WAS OPEN TO ATMOSPHERE AT ORIGINAL AND NEW TRAP LOCATIONS AT TIME OF ACCIDENT. CONTRACTORS PERFORMING WORK AT NEW TRAP LOCATION WERE EXPERIENCING ELEVATED LEL AND BENZENE PRIOR TO ACCIDENT. OPERATOR PERSONNEL RECOMMENDED USING COPPUS FAN TO GET AIR MOVEMENT THROUGH THE PIPE. CONTRACTOR INSTEAD INSTALLED DRESSER COUPLING AND CAP WITH 1-INCH THREAD-O-LET TO THE STATION PIPE. AN AIR COMPRESSOR WAS ATTACHED TO THIS CAP AND USED IN ATTEMPT TO PUSH VAPORS FROM WORKSITE. WHILE PUSHING AIR TO CONTROL VAPORS, CRUDE OIL WAS INADVERTENTLY PUSHED THROUGH THE STATION PIPE. PROJECT INSPECTOR INITIALLY FOUND APPROXIMATELY 4.55 BBL OF OIL IN EXCAVATION AT THE ORIGINAL TRAP SITE. VISIBLE SOIL CONTAMINATION AND FREE PRODUCT WERE REMOVED ON THE DAY OF THE ACCIDENT. ONGOING MONITORING OF THE SITE IDENTIFIED GROUNDWATER AND CRUDE INGRESS INTO THE EXCAVATION. GROUNDWATER SKIMMING PERFORMED TO REMOVE REMAINING OIL. TOTAL RECOVERED VOLUME OF 15 BBL."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in