EXXONMOBIL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorEXXONMOBIL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.17291, -90.78796

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON JANUARY 20, 2020, MOV 5976 HAD AN EXTERNAL PACKING LEAK LOCATED AT THE BOTTOM OF THE VALVE. 14.5 GALLONS OF RAW MAKE WAS RELEASED INTO THE ATMOSPHERE. THE MOV 5976 IS LOCATED AT THE HIGH SIDE OF THE RAW MAKE METER SKID IN THE SORRENTO DOME FACILITY. FLOW WAS SHIFTED TO THE LOW SIDE OF THE RAW MAKE METER SKID TO CONTINUE OPERATIONS.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in