ROSE ROCK MIDSTREAM OPERATING, LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | ROSE ROCK MIDSTREAM OPERATING, LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 36.02005, -96.75378 |
Cause
| Cause | OTHER OUTSIDE FORCE DAMAGE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON FEBRUARY 26TH DURING ROAD/GRAVEL WORK, A LOADED SKID STEER SLID OFF THE SIDE OF THE FACILITY ROAD WHERE IT SLOUGHED OFF AND BROKE A 1"" THREADED FITTING. THIS WAS ON A 20"" LINE THAT WAS IN SERVICE AT THE TIME AND LEAKED APPROXIMATELY 3.5 BBLS OF CRUDE. THE LINE WAS SHUT DOWN. THE CRUDE TRAVELED DOWN A CULVERT AND ENDED UP IN THE RETENTION POND WITHIN THE STATION WHERE IT WAS BOOMED OFF AT THE ENTRANCE TO THE POND. THE NIPPLE WAS REPAIRED, THE LEAK CLEANED UP AND THE LINE WAS RESTARTED. TO PREVENT RECURRENCE BARRICADES WILL BE PLACED AT THIS LOCATION TO PROTECT THE PIPING.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.