"PLAINS PIPELINE, L.P."

hazardous_liquid Incident — — November 4, 2021

Incident Information

Incident DateNovember 4, 2021
Operator"PLAINS PIPELINE, L.P."
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates32.53203, -100.84197

Cause

CauseCORROSION FAILURE
SubcauseEXTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$10,009
Emergency Response$10,563
Other Costs$0

Location Map

Incident Narrative

"APPROXIMATELY 165 BARRELS OF CRUDE OIL WERE RELEASED FROM THE PUMP 9 DISCHARGE STATION PIPING AT CHINA GROVE STATION. THE DATE AND TIME OF THE RELEASE (PART A Q4) IS INDICATIVE OF THE EARLIEST POSSIBLE TIME THE RELEASE COULD HAVE STARTED, AS IT WAS THE DATE/TIME THAT THE PUMP HAD STARTED. THE CAUSE OF THE RELEASE WAS ATTRIBUTED TO EXTERNAL CORROSION AS A RESULT OF STAY CURRENT INFERENCE. TO PREVENT FUTURE INCIDENTS, AN INTERRUPTED CLOSE INTERVAL CATHODIC PROTECTION SURVEY WILL BE PERFORMED TO DETERMINE THE CAUSE OF THE STRAY CURRENT AND ENSURE THAT OTHER FACILITY PIPING DOES NOT HAVE STRAY CURRENT INTERFERENCE. SUPPLEMENTAL NARRATIVE: UPDATED THE NOMINAL DIAMETER OF THE FAILED SECTION OF PIPE TO 10"" (PART C Q3.A). SUPPLEMENTAL NARRATIVE (2): THE CAUSE OF THE RELEASE WAS ATTRIBUTED TO EXTERNAL CORROSION, LIKELY FROM STAY CURRENT INFERENCE AS INDICATED BY THE PIT MORPHOLOGY. THE TYPE OF STRAY CURRENT INTERFERENCE IS NOT KNOWN (PART G1 Q2A). TO PREVENT FUTURE INCIDENTS, A CIS SURVEY WAS CONDUCTED AND RESULTS INDICATED THAT THE INCIDENT LOCATION MET CRITERIA. ADDITIONALLY, IN 2022, NON-DESTRUCTIVE TESTING INSPECTIONS WILL BE CONDUCTED FOR SELECT PIPELINE SEGMENTS WITHIN THE FACILITY."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in