COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 35.33987, -96.97866 |
Cause
| Cause | EXCAVATION DAMAGE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
A FARMER PUNCTURED THE PIPELINE WHILE HE WAS INSTALLING A TIN HORN DRAINAGE. CVR WAS ABLE TO CONTAIN THE OIL TO A SMALL AREA. PIPELINE WAS SHUTDOWN UNTIL REPAIRS WERE COMPLETED. CVR CUT OUT A 10' SECTION OF THE PIPELINE AND REPLACED IT WITH PRETESTED 8.625"" .322"" API-5L X52 FBE COATED PIPE. WELDING QUALIFICATIONS AND WELDING PROCEDURES WERE IN A ACCORDANCE WITH API 1104 (LATEST IBR) AND BOTH ENDS WERE X-RAYED IN ACCORDANCE WITH 195.234.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.