"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — January 26, 2022

Incident Information

Incident DateJanuary 26, 2022
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.12201, -94.43841

Cause

CauseEQUIPMENT FAILURE
SubcauseOTHER EQUIPMENT FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,899
Emergency Response$76,501
Other Costs$0

Location Map

Incident Narrative

TANK WATER DRAW VALVE DID NOT PROPERLY SEAL WHICH CAUSED ICE TO FORM IN THE INTERSTITIAL SPACE IN BETWEEN THE INNER AND OUTER VALVE OF THE VALVE RESULTING IN THE RELEASE. UPDATE FOR CLOSURE 5-12-2022: AFTER REMOVAL OF THE VALVE THERE WAS DEBRIS DISCOVERED IN THE INTERSTITIAL SPACE OF THE VALVE WHICH PREVENTED IT FROM PROPERLY SEATING. A NEW WATER DRAW DRAIN VALVE HAS BEEN INSTALLED AND IS OPERATING NORMALLY.