MAGELLAN PIPELINE COMPANY, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorMAGELLAN PIPELINE COMPANY, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates36.14799, -96.03286

Cause

CauseEXCAVATION DAMAGE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 14:28 ON JUNE 8, 2020, MAGELLAN'S TULSA - BARNSDALL #4-12"" PIPELINE WAS IMPACTED BY A SECOND PARTY LINE STRIKE DURING HORIZONTAL DIRECTIONAL DRILLING OPERATION. AT THE TIME OF THE INCIDENT, MAGELLAN'S CONTRACTOR WAS PERFORMING THE PILOT HOLE OPERATION FOR THE #3-12"" PIPELINE REPLACEMENT ACROSS THE ARKANSAS RIVER AND STRUCK THE #4-12"" PIPELINE NORTH OF THE ARKANSAS RIVER BETWEEN THE NORTH LEVEE AND CHARLES PAGE BLVD. CODE RED RESPONSE WAS INITIATED AND FIELD PERSONNEL WERE DISPATCHED TO FURTHER ISOLATE THE BLOCKED IN SECTION WITH MANUAL VALVES AND BEGIN CLEANUP ACTIVITIES. AT THE TIME OF THE INCIDENT, THE PIPELINE WAS SHUT DOWN AND ISOLATED WITH REMOTE ISOLATION VALVES. THE #4-12"" PIPELINE WAS RETURNED TO SERVICE BY COMMISSIONING A NEWLY INSTALLED HDD REPLACEMENT CROSSING FOR THE #1-12"". THE IMPACTED PIPELINE SEGMENT WILL BE GROUT FILLED AND ABANDONED IN PLACE. THE PUNCTURE SIZE IS AN ESTIMATE BASED ON RELEASE VOLUME. NRC 48-HOUR UPDATE: #1279210, 06/09/14:12 SUPPLEMENTAL/FINAL:(09/11/2020) PART A11, D8, E9, G3-17, H

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in