ENTERPRISE PRODUCTS OPERATING LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENTERPRISE PRODUCTS OPERATING LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates32.36339, -101.88483

Cause

CauseEXCAVATION DAMAGE
Subcause—

Casualties

Fatalities0
Injuries1

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON JULY 28, 2020 AT 11:52 AM CDT HOUSTON CONTROL CENTER (HCC) RECEIVED A CHANGE OF PRESSURE ALARM AT MP 65 ON THE SEMINOLE BLUE MAINLINE. PRESSURE DROPPED BY APPROXIMATELY 700 PSIG. HCC IMMEDIATELY BEGAN SHUTDOWN OF THE PIPELINE AND CLOSING BLOCK VALVES UPSTREAM AND DOWNSTREAM OF THE OBSERVED PRESSURE DROP. PIPELINE WAS FULLY SHUTDOWN AND ISOLATED AT APPROXIMATELY 12:00 CDT. HCC WAS NOTIFIED THAT A FIRE WAS ON THE RIGHT-OF-WAY AT 12:45 CDT. A PIECE OF HEAVY EQUIPMENT BELONGING TO A THIRD PARTY CONTRACTOR WAS PARKED ON THE RIGHT-OF-WAY ENGULFED IN FLAMES. THE FIRE WAS EXTINGUISHED ON JULY 30, 2020 AT APPROXIMATELY 17:15 CDT. THE DAMAGED SECTION OF PIPE WAS REPLACED ONCE THE AREA WAS MADE SAFE. THE SYSTEM WAS RETURNED TO SERVICE ON AUGUST 1, 2020 AT 18:38 CDT. FOUR EMPLOYEES OF THE THIRD PARTY EXCAVATOR WERE INJURED, ONE REQUIRED HOSPITALIZATION. THE INITIAL NRC NOTIFICATION #1283012 WAS MADE AT 13:38 CDT ON 7/28/2020, AND THE 48-HOUR NRC UPDATE #1283205 WAS MADE AT 11:48 CDT ON 7/30/2020. TRRC ACCIDENT #2237

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in