MARATHON PIPE LINE LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | MARATHON PIPE LINE LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 39.32623, -87.89847 |
Cause
| Cause | NATURAL FORCE DAMAGE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON FEBRUARY 23, WHEN STARTING A TANK TO TANK TRANSFER, OPERATIONS DISCOVERED SEEPING AT THE BASE PLATE OF MARTINSVILLE BOOSTER 2. THE BOOSTER WAS IMMEDIATELY SHUT DOWN, ISOLATED AND DRAINED. APPROXIMATELY 1.5 GALLONS OF HEAVY NAPTHA WAS RELEASED AND CLEANED UP PROMPTLY. THE RELEASE WAS CAUSED BY A CRACK IN THE BODY OF THE DEEP WELL VERTICAL TURBINE BOOSTER. REPAIRS TO THE BOOSTER ARE ONGOING. 48 HR. NRC NOTIFICATION #1298944. BOOSTER 2 WILL BE REPAIRED AND PLACED BACK INTO SERVICE, BUT A DATE HAS YET TO BE DETERMINED. RECOMMENDATIONS TO ENSURE THIS TYPE OF INCIDENT WILL NOT OCCUR AGAIN IN THE FUTURE, IS TO FILL THE SPACE BETWEEN THE CASING AND PUMP CAN FOR MARTINSVILLE BOOSTER 2 WITH WAX, AS WELL AS ENSURING BOOSTER PUMPS AT OTHER LOCATIONS ARE INSPECTED TO DETERMINE IF THE SPACING BETWEEN THE CASING AND PUMP CAN IS FILLED WITH WAX.