hazardous_liquid Incident — — March 17, 2021

Incident Information

Incident DateMarch 17, 2021
OperatorCCPS TRANSPORTATION, LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates39.00528, -93.55774

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$32,120
Emergency Response$12,204
Other Costs$0

Location Map

Incident Narrative

ON MARCH 17, 2021 AT APPROXIMATELY 1:05 PM CDT, AN ENBRIDGE EMPLOYEE NOTICED CRUDE OIL ON THE SURFACE ABOVE LINES 55 AND 59, APPROXIMATELY 100 FEET DOWNSTREAM OF THE MAINLINE VALVE AT MP 302.01. THE EDMONTON CONTROL CENTER WAS NOTIFIED AND LINES 55 AND 59 WERE SHUT DOWN. UPON INVESTIGATION, IT WAS DETERMINED THAT APPROXIMATELY FIVE GALLONS HAD LEAKED FROM A STOPPLE TEE FITTING ON LINE 55. ONCE IT WAS DETERMINED THAT LINE 59 WAS NOT THE SOURCE OF THE RELEASE, APPROVAL TO RESTART LINE 59 WAS GIVEN. INITIAL NRC NOTIFICATION WAS MADE ON MARCH 17, 2021 AT 2:18 PM CDT (NRC #1300612). A 48-HOUR UPDATE WAS MADE TO THE NRC ON MARCH 19, 2021 AT 8:32 AM CDT (NRC #1300776). THE CAUSE OF THE RELEASE WAS DUE TO BREAK-AWAY TORQUE OF EXISTING STUDS ON THE COMPLETION BLIND INSTALLED ON THE STOPPLE TEE. THE FITTING WAS TORQUED IN ACCORDANCE WITH ENBRIDGE STANDARDS AND THE SOURCE OF THE LEAK WAS CONTAINED BY ON-SITE PERSONNEL WITH NO OFF-PROPERTY IMPACT. ALL CONTAMINATED SOIL WAS REMOVED FROM THE AREA AND DISPOSED OF. APPROVAL TO RESTART LINE 55 WAS GIVEN FOLLOWING THE REPAIR.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in