BUCKEYE PARTNERS, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBUCKEYE PARTNERS, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates41.64338, -87.47790

Cause

CauseNATURAL FORCE DAMAGE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON THE EVENING OF JUNE 9, 2021 THE EMPLOYEE AT BUCKEYE'S EAST CHICAGO WEST TERMINAL DISCOVERED A FLANGE MISTING ULSD ON THE EG999KG LINE SHORTLY AFTER A ROUTINE TRANSFER. THERE WAS AN INSULATING GASKET RECENTLY INSTALLED NEXT TO A FLANGE WHERE THE RELEASE OCCURRED. SHORTLY AFTER THE GASKET WAS INSTALLED, THIS LOCATION STARTED HAVING SIGNIFICANT INCREASES IN TEMPERATURES WITH THERMAL GROWTH WHICH IS SUSPECTED AS THE CAUSE OF THIS RELEASE. AN ESTIMATE OF 10 GALLONS OF PRODUCT WAS RELEASED, THE TRANSFER WAS SHUTDOWN, AND PRODUCT WAS CLEANED UP IMMEDIATELY BY BUCKEYE AND ASSISTANCE FROM OSRO. INTERNAL NOTIFICATIONS WERE MADE AND THIS RELEASE DID NOT MEET THE CRITERIA OF NRC IMMEDIATE NOTIFICATION REQUIREMENTS .

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in