MARATHON PIPE LINE LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorMARATHON PIPE LINE LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates37.94755, -84.49537

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 7/6/2021 AT 7:16AM LOCAL TIME, MPL FIELD PERSONNEL IDENTIFIED STAINED GRAVEL AROUND BV2 AT THE TATES CREEK STATION. FIELD PERSONNEL CALLED THE CONTROL CENTER TO SHUTDOWN THE PIPELINE. STATION WAS THEN ISOLATED AHEAD OF EXCAVATION TO DETERMINE LEAK SOURCE. EXCAVATION REVEALED THE LEAK SOURCE TO BE A CORRODED 1-INCH DRAIN PLUG ON THE BOTTOM OF BV2. METALLURGICAL ANALYSIS EXECUTIVE SUMMARY: THE RESULTS OF THE ANALYSIS INDICATE THAT THE CORROSION OF THE FAILED PLUG WAS ASSOCIATED WITH THE INTERNAL ENVIRONMENT WITHIN THE VALVE. GALVANIC (DISSIMILAR METAL) CORROSION LIKELY PLAYED A ROLE IN THE FAILURE GIVEN THE MATING THREADS OF THE FAILED PLUG DID NOT EXHIBIT ANY EVIDENCE OF CORROSION. THE DRAIN PLUG WAS REPLACED AND THE LINE WAS RE-PRESSURIZED FOR A LINE STATIC TEST. THE LINE STATIC TEST PASSED AND THE LINE WAS APPROVED FOR RESTART AT 12:15PM ON 7/7/2021. ON 7/8/2021 AT 17:09 LOCAL TIME, A 48 HOUR NRC UPDATE CALL, #1310089, WAS MADE. FINAL REPORT UPDATES PART D QUESTION 8 AND PART G. 11/11/2021 SUPPLEMENTAL AND FINAL REPORT UPDATED ANSWER TO PART C QUESTION 2 TO MORE ACCURATELY REFLECT THE SYSTEM PART.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in