COLONIAL PIPELINE CO

hazardous_liquid Incident — — October 2, 2023

Incident Information

Incident DateOctober 2, 2023
OperatorCOLONIAL PIPELINE CO
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates36.06541, -79.93475

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
Subcause"DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED"

Casualties

Fatalities0
Injuries0

Costs

Property Damage$385,000
Emergency Response$1,423,000
Other Costs$0

Location Map

Incident Narrative

"ON OCTOBER 2, 2023, A COMPANY EMPLOYEE WAS CONDUCTING A ROUTINE INSPECTION AT THE GREENSBORO JUNCTION TANK FARM IN GREENSBORO, NORTH CAROLINA. THE EMPLOYEE OBSERVED SHEEN ON AN OIL WATER SEPARATOR. UPON FURTHER INVESTIGATION, THE EMPLOYEE IDENTIFIED STAINING IN A DIKE AND OBSERVED PRODUCT ON TANK 863'S RING WALL. TANK 863 WAS REMOVED FROM SERVICE, AND ITS PRODUCT WAS TRANSFERRED TO TANK 880. A TANK INSPECTION IS BEING COMPLETED TO DETERMINE THE CAUSE OF THE CRACK THAT LED TO THE RELEASE. UPDATE: THE LEAK RESULTED FROM MULTIPLE CRACKS IN THE DRAIN DRY SUMP. DIKE FLOODING MAY HAVE CAUSED THE SUMP TO FLOAT RESULTING IN STRESS ON THE CONNECTING WELDS."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in