"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident — — October 11, 2023

Incident Information

Incident DateOctober 11, 2023
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates38.00045, -96.67383

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$300,000
Emergency Response$260,000
Other Costs$0

Location Map

Incident Narrative

"AT 15:48 ON OCTOBER 11TH, OPERATIONS CONTROL RECEIVED A CPM RUPTURE ALARM ON THE EL DORADO TO KANSAS CITY #6-10"" PIPELINE AND INITIATED A CODE RED. THE CONTROLLER IMMEDIATELY SHUTDOWN EL DORADO UNIT #2, CLOSED UPSTREAM AND DOWNSTREAM ROVS, AND THEN CONTACTED LOCAL OPERATIONS TO NOTIFY PERSONNEL OF THE RELEASE EVENT. AT 15:49, MAGELLAN WAS NOTIFIED BY THE LANDOWNER THAT HE STRUCK A PIPELINE WHILE DREDGING AN EMPTY POND. LOCAL PERSONNEL WERE DISPATCHED TO THE AREA AND CLOSED UPSTREAM AND DOWNSTREAM MANUAL VALVES, FURTHER ISOLATING THE SEGMENT. CLEAN-UP ACTIVITIES WERE INITIATED. AFTER DRAIN-UP ACTIVITIES WERE COMPLETED ON THE PIPELINE, THE DAMAGED PIPE SECTION WAS REMOVED AND REPLACED WITH NEW PRE-TESTED PIPE. THE LINE RESUMED NORMAL OPERATIONS ON THE AFTERNOON OF 10/14/2023. TO PREVENT A RE-OCCURRENCE, THE LANDOWNER WAS INFORMED OF STATE ONE CALL LAWS AND VERIFIED THERE ARE NO PLANS TO DREDGE OTHER PONDS IN THE RIGHT-OF-WAY."