EXXONMOBIL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorEXXONMOBIL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.88614, -95.37416

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 15:00 ON NOVEMBER 16, 2021 A CONTRACTOR CREW WORKING FOR EMPCO WAS HYDRO-EXCAVATING SOIL AT ALDINE STATION. AS THE SOIL WAS REMOVED FROM THE 4"" DRAIN LINE THAT WAS ALREADY ISOLATED, A SMALL PINHOLE AT THE 4:00 POSITION BEGAN TO RELEASE JET FUEL INTO THE EXCAVATION. A VACUUM TRUCK WAS ONSITE AND IMMEDIATELY BEGAN REMOVING PRODUCT FROM THE EXCAVATION AND DRAIN LINE TO PREVENT FURTHER RELEASE OF JET FUEL TO SOIL. A TEMPORARY REPAIR CLAMP WAS PLACED ON THE 4"" DRAIN LINE TO STOP THE RELEASE. TO PREVENT RE-OCCURRENCE, THE DRAIN LINE WILL BE COMPLETELY REPLACED.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in