SUNOCO PIPELINE L.P.

hazardous_liquid Incident — — March 14, 2024

Incident Information

Incident DateMarch 14, 2024
OperatorSUNOCO PIPELINE L.P.
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates40.31474, -76.03397

Cause

CauseCORROSION FAILURE
SubcauseEXTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$8,000
Emergency Response$38,000
Other Costs$0

Location Map

Incident Narrative

"ON 3/14/2024 AT APPROXIMATELY 07:30, DURING DAILY CHECKS AT MONTELLO PUMP STATION, AN OPERATOR NOTICED PRODUCT ON THE GROUND BY A VALVE STEM NEAR PROVER LINE. LINES IN THE VICINITY OF THE AFFECTED AREA WERE SHUT DOWN. EXCAVATION BEGAN TO IDENTIFY SOURCE. AT 16:30, THE LEAK WAS DETERMINED TO BE COMING FROM A PINHOLE ON THE NORTH PROVER INLET 6-INCH LINE. THE LARGER AREA WAS INVESTIGATED AND CONFIRMED NO PRODUCT LEFT THE IMMEDIATE AREA NOR ENTERED THE STORM DRAINS ON SITE. APPROXIMATELY 2 BBLS OF DIESEL FUEL WAS RELEASED INTO THE SOIL. THE OSRO PROVIDED A VACUUM TRUCK FOR PRODUCT RECOVERY AND LINED ROLL OFF FOR CONTAMINATED SOIL. ON 3/18/2024, OPERATIONS CUT AND BLINDED NORTH LINE PROVER INLET LEG. THE FAILED SECTION HAS BEEN CUT OUT AND SENT TO 3RD PARTY LABORATORY FOR ANALYSIS. A SUPPLEMENTAL REPORT WILL BE SUBMITTED ONCE THE INVESTIGATION IS COMPLETE. SUPPLEMENTAL & FINAL: THE METALLURGICAL ANALYSIS DETERMINED THAT THE FAILURE WAS DUE TO AN EXTERNAL CORROSION PINHOLE. THE CAUSE OF THE EXTERNAL CORROSION WAS MICROBIAL (MIC). THE FAILED PIPING WAS COATED WITH A TAPECOAT COATING THAT WAS DISBONDED WITH LIQUID UNDER THE COATING. THE PROVER INLET LEG WAS REPLACED WITH FBE COATED PIPE TO PREVENT REOCCURRENCE."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in