COLONIAL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorCOLONIAL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.71892, -95.18025

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 7/22/22, AT APPROXIMATELY 23:46 CST, A COLONIAL OPERATOR RECEIVED A RELIEF ALARM FROM PASADENA (PDA) AND HOUSTON STATION (HTN) WHILE SHUTTING DOWN OUT OF KME. AN OPERATOR CONDUCTING A RESTART INSPECTION OBSERVED PRODUCT BEING RELEASED FROM THE PDA RELIEF FLOW SWITCH AND ASSOCIATED CONDUIT BOX AT APPROXIMATELY 00:12 CST. THE OPERATOR, UPON DISCOVERY, REQUESTED THE SHUT DOWN, ISOLATION AND RELIEF OF PRESSURE ON LINE 1 (L1) HTN STATION. THE SHUT DOWN WAS COMPLETED AND THE RELEASE WAS STOPPED AT APPROXIMATELY 00:27 CST. APPROPRIATE NOTIFICATIONS WERE MADE AND ADDITIONAL SPILL RESPONSE PERSONNEL WERE MOBILIZED TO SUPPORT SPILL RESPONSE ACTIVITIES. UPON FURTHER INVESTIGATION IT WAS DETERMINED THAT THE ""BELLOWS ASSEMBLY"" ON THE FLOW SWITCH HAD A PINHOLE LEAK. THE BELLOWS ASSEMBLY IS A COMPONENT OF THE RELIEF EQUIPMENT. A PORTION OF THE RELEASED PRODUCT MIGRATED TO THE ADJOINING INDUSTRIAL FACILITY. COLONIAL PERSONNEL NOTIFIED A REPRESENTATIVE OF THE ADJOINING FACILITY AND MADE ARRANGEMENTS TO REMEDIATE THE IMPACTED AREA. THE RELEASED VOLUME WAS RECOVERED AND L1 WAS RESTARTED AT APPROXIMATELY 10:05 CST. BASED ON THE RELEASED VOLUME AND COST OF REPAIRS/RESPONSE, NO NRC NOTIFICATION WAS REQUIRED. A FORMAL INCIDENT ANALYSIS (IA) WILL BE CONDUCTED FOR THIS INCIDENT. PRIOR TO INSTALLATION, THE SWITCH HAD BEEN TESTED FOR FUNCTIONAL INTEGRITY AND PERFORMED AS DESIGNED. THE INVESTIGATION FOUND THE FLOW SWITCH WAS NOT RATED FOR THE MAXIMUM FLOW POTENTIAL OF THE RELIEF LINE AND THAT THE STANDARDS AND SPECIFICATIONS WERE VAGUE IN THIS DETAIL. COLONIAL WILL BE CONTINUING EFFORTS TO EVALUATE FUNCTIONAL PARAMETERS OF SWITCHES.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in