ONEOK NGL PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorONEOK NGL PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.85469, -94.89248

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 11-2-22 AT APPROXIMATELY 8:58AM, ONEOK PERSONNEL IDENTIFIED A LEAK NEAR PUMP 122 AT THE ONEOK MONT BELVIEU PUMP STATION. EMERGENCY RESPONSE MEASURES WERE INITIATED AND THE LOCATION OF THE LEAK WAS ISOLATED. A 1"" THREADED NIPPLE ON THE SUCTION VALVE THERMAL BYPASS WAS FOUND TO HAVE A CRACK CAUSING THE RELEASE. THE 1"" THREADED NIPPLE HAS BEEN SENT FOR MATERIAL ANALYSIS. A SUPPLEMENTAL REPORT WILL BE SUBMITTED WHEN THE MATERIAL ANALYSIS RESULTS ARE RECEIVED AND ONEOK'S INVESTIGATION INTO THE FAILURE IS COMPLETED. UPDATE 1/5/23 SUPPLEMENTAL/FINAL THE FAILED 1"" THREADED NIPPLE HAS BEEN REPLACED WITH A 1"" WELDOLET AND THE 1"" SUCTION VALVE THERMAL BYPASS PIPING HAS BEEN REINFORCED WITH SUPPORTS. NO MATERIAL ANALYSIS RESULTS ARE AVAILABLE DUE TO THE FAILED 1"" THREADED NIPPLE BEING FURTHER DAMAGED DURING REMOVAL.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in