OLYMPIC PIPE LINE COMPANY

hazardous_liquid Incident — — December 3, 2024

Incident Information

Incident DateDecember 3, 2024
OperatorOLYMPIC PIPE LINE COMPANY
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates47.45840, -122.22422

Cause

CauseEQUIPMENT FAILURE
SubcausePUMP OR PUMP-RELATED EQUIPMENT

Casualties

Fatalities0
Injuries0

Costs

Property Damage$10,000
Emergency Response$4,500
Other Costs$0

Location Map

Incident Narrative

"INJECTION PUMP PACKING GLAND ADJUSTER PLATE BECAME MISALIGNED DURING OPERATION, CAUSING DIRECT CONTACT WITH THE PISTON. THIS RESULTED IN A SHEARING OF THE SUPPORT STUD DUE TO FATIGUE, ALLOWING THE PACKING TO BE DISPLACED BY THE PRODUCT. THE SEAL LEAK BOX SWITCH ACTIVATED SENDING AN ""INJECTION PUMP SEAL FAILURE ALARM"" AND ISOLATING THE INJECTION PUMP. PUMP WAS REBUILT AND PUT BACK INTO SERVICE."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in